The Government of South Australia issued an Invitation for Expression of Interest (EOI) to invite submissions from those interested in being selected to undertake the construction and operation of a suitable harbour at Port Bonython for the export of bulk minerals and commodities.
BMT were engaged as specialist port and harbour engineers to provide a concept planning study for port sitting options to inform the commercial bid.
The service provided encompassed a wide range of works, from desktop assessment of metocean conditions to determine optimal port location, through to concept design and costing of marine infrastructure.
We were appointed by Vopak Yang Pu, Hainan Storage Terminal to provide consultancy services on all matters relating to the marine facilities for the terminal development.
We have been providing engineering support to Muhibbah Engineering Bhd for the LNG Regasification Facilities Project, commencing from FEED for the LNG regas unit and the Island berth.
We were engaged by the Bunbury Port Authority in 2004 and again in 2007 to manage maintenance dredging works undertaken in the harbour and channel areas of the Port.
With our expertise in port planning and close knowledge of Western Australian ports, we provided port expansion options, dredging and construction solutions, and cost estimates for construction and facility operations.